Chengdu Subway

Chengdu Subway Map
Click the above map to enlarge it, or
go for more Chengdu Subway Maps

With the opening of subway Line 1 on 27th September, 2010, Chengdu has become the first city with metro system in western China. Subway line 2 was also opened on 16th September, 2012. As the future plans show, another 8 lines will develop in the city which will make metro transport accessible to the city's East Railway Station, West Railway Station and Shuangliu International Airport. At present, only subway Line 1 and the first phase of line 2 are in operation, while the line 3, line 4, and line 5 are under construction.

 Ticket Fare: The price for the ticket of subway lines in Chengdu ranges from CNY2 to CNY5 according to the traveling stops. It means CNY2 for 6 stops; CNY3 for 10 stops; CNY4 for 16 stops; and CNY5 for 24 stops. According to this, the full price for subway line 1 is CNY4 and CNY5 for subway line 2.

 Line 1: Shengxian Lake – Hualong Road 
Chengdu Metro StationTotal Length: 36km
Station Number: 28
First Phase of Line 1: Shengxian Lake – Century City
Length: 18.5 kilometers (11.5 miles)
Station Number: 17
Stations: Shengxian Lake – North Railway Station – Renmin Rd. North – Wenshu Monastery – Luomashi – Tianfu Square –Jinjiang Hotel – Huaxiba –Sichuan Gymnasium – Nijiaqiao – Tongzilin – South Railway Station – Hi-Tech Zone – Financial City – Incubation Park – Ocean Park – Century City

 Line 2: Xipu – Longquan Music Square
Total Length: 44km
Station Number: 32
First Phase of Line 2: Chadianzi Bus Station – Chengdu Institute of Public Administration
Length: 20.47km (13.96 miles)
Station Number: 20
Stations: Chadianzi Bus Station – Yangxi Cloverleaf Junction – Yipintianxia – Shuhan Road East – Baiguolin – Chengdu University of TCM (Provincial People's Hospital) – Tonghuimen – People’s Park – Tianfu Square – Chunxi Road – East Gate Bridge – Niuwangmiao – Niushikou – Dongda Road – Tazishan Park – East Railway Station – Chengyu Cloverleaf Junction – Huiwangling – Honghe – Chengdu Institute of Public Administration
West Extension of Line 2: Xipu – Chadianzi Bus Station
East Extension of Line 2: Chengdu Institute of Public Administration – Longquan Music Square
Note: The West Extension Line has been opened on June 8, 2013, while the East Extension line is expected to be put into operation in 2014.

 Line 3: Xindu Hongxing – Shuangliu Flatbridge
Total Length: 49.8km
Station Number: 33
Major Stations:  Xindu Hongxing – Dianzi Road – Tianhui Town – Army General Hospital – Zoo – Sima Bridge (transfer with line 5) – Lijiatuo ( transfer with line 6) – Amusement Park – Hongxing Road (transfer with line 4) – Chunxi Road (transfer with line 2) – Xinnanmen – Mozi Bridge –Sichuan Gymnasium (transfer with line 1) – Yiguanmiao – Gaosheng Bridge (transfer with line 5) – Taiping Garden (transfer with line 7) – Hongpai Building – Wuxing Road – Jinxing Road – Jiedai Temple – Tanghu Park – Shuangliu Circle City Road – Shuangliu Flatbridge
Note: The first phase of line 3 is predicted to be completed in 2015.

Chengdu Subway Line 4: Wenjiang – Xihe Town
Total Length: 41.3km
Station Number: 26
Major Stations: Wenjiang Yangliu River – Wenjiang Flower Expo Site – Yongquan – Kanghe – Hongnian Village – Chengdu West Station – Supo Bridge – Jinsha Bus Station (transfer with line 7) – Tiemenkan – Provincial People's Hospital (transfer with line 2 and line 5) – Commercial Street – Luomashi (transfer with line 1) – Hongxing Road (transfer with line 3) – Tianxiang Temple  – Yushuang Road (transfer with line 6) – Wannianchang – Jiancai Road (transfer with line 7) –  Shiling –  Shiling Yuejin Village – Xihe Town
Note: The first phase of line 4 is scheduled to be open at the end of 2015.

 Line 5: Pihe – Dacheng’er Street
Total Length: 34.3km
Station Number: 28
Major Stations: Simaqiao (transfer with line 3) – North Railway Station (transfer with line 1) – Shawan (transfer with line 6)– Ximen Bus Station -- Provincial People's Hospital (transfer with line 2 and 4) – Dashi Road – Gaosheng Bridge (transfer with line 3) – Yongfeng Overpass – Shenxianshu (transfer with line 7) – Shiyangchang – Qinghe Village – Minle Village – Huayang Jianghe
Note: Line 5 is predicted to be put into operation in 2016.

 Line 6: Shawan – Sihe Village
Length: 22.05km
Major Stations: Shawan (transfer with line 5) – Renmin Road North (transfer with line 1) – Lianjiaxiang – Lijiatuo (transfer with line 3) – Jianshe Road – Yushuang Road (transfer with line 4) – Niuwangmiao (transfer with line 2) – Shunjiang Road – Chengren Road – Jinxiang Garden (transfer with line 7) – Liulichang – Zhonghe Town – Sihe Village
Branch of line 6: Liulichang – Shuangliu Airport
Length: 15.11km
Major Stations: Liulichang -- Hongxing South – Xinyizhou – Qinghe Village (transfer with line 5) – Baijia Road Crossing – Sichuan University (New Campus) – Southwest University For Nationalities – Shuangliu Airport
Note: The opening time in uncertain.

 Line 7:
Total Length: 38.6km
Station Number: 31
Major Stations: Chengbei Passenger Transport Center – North Railway Station – Sima Bridge – Bali Community – East District Hospital – Erxian Bridge – Chengdu University of Technology – Chenghua Avenue – Cuijiadian – Wannianchang – Jiancai Road –  East Passenger Station – Shahepu – Shizishan – Sichuan Normal University – Liulichang – Kehua South Road  – South Railway Station –Shenxianshu – Shenxianshu West – Hongpai Building South – Wuhou Shuangnan – Qingshuihe Bridge – Guanghua Village – Qingjiang Road Crossing – Jinsha Museum – Yipin Tianxia – Chadianzi Station – Huazhaobi – Jiaoda Road Crossing Second Ring Road – Jiulidi Road Crossing
Note: The construction of this line is planed to be completed before 2020.

 Line 8:
Total Length: 36.1km
Station Number: 27
Major Stations: Longtan Temple – Xinqiao – Shilidian – Tiaodenghe – Mashi Bridge – Xinhong Road – Tianxiang Temple – Dongmen Bridge – Xinnanmen – Huaxiba – Martial Marquis Memorial Temple  (Wu Hou Ci) – Dashi Road – Qigshuihe – Jinyang Road – Jitou Town – Yongkang Forest Park
Note: Line 8 is a reservation line. The stations may be rearranged in the future. The above route is just a reference.
Note: This line is planed to be constructed from 2020.

 Line 9
Total Length: 27.5km
Station Number: 14
Major Stations: North Lake – Erxian Bridge – Jianshe North Road – Mashi Bridge – Wannianchang – chengren Road – Nijia Bridge – Yongfeng Overpass – Taiping Temple – Shuangliu Wenchang – air port – Guangdu Avenue – Shuangliu Slab Bridge – Shuangliu Dongsheng Town
Note: The stations may be renamed and rearranged in the future.
Note: Its operation time in uncertain and the stations may be renamed and rearranged in the future.

 Line 10
Total Length: 10.2km
Station Number: 5
Major Stations: Hongpai Building South – Shuangliu International Airport
Note: The stations along this route are not unveiled officially.
Note: Its operation time is undetermined and the stations along this route are not unveiled officially.

-